Change Language:
Company Profile
Culture
Credentials
Equipments
Count Us
Company Profile

Luoyang City-based Engineering Company Limited (referred to as the Rockies to the company) is engaged in a bored pile foundation for a bridge construction professionals, has gone through more than three decades of glorious history, especially after the success of the restructuring in 2004, has strengthened The strength of the company, changed the face of the company to standardize the company's management, present, the loki is a new system, the new lineup, new ideas, new spirit of close cooperation with old and new friends, create brilliant.

More than three decades, engaged in a bridge bored pile foundation for the construction practice, we have a Slurry Wall, the cycle is the impact of pore-skilled, break through the drilling process, prone to collapse hole, cavity, the slant-hole , Sticking, plasma leakage problems such as accidents, training has become a strong technical and skilled operation, experienced, hard-working construction team.

The pursuit of progress and create new fields, climbing to new heights, is Rocky's glorious tradition, then difficulties can not be stopped there and hard work, hard to open up the spirit of the "Rocky people." After practice, continuous improvement, and finally succeeded in using mud mortar separator and purifier (Heixuan Feng) to carry out the mud and the cycle of Chiang Khong, bid farewell to use slag out of the backward technology, to shorten the time to pore-forming, increased the efficiency of the construction, To guarantee the hole, hole-money quality, the company accelerated the pace of progress.

The advance of our times, with the scientific and technological innovation, increase in long-span bridges, the basis for Tun accordingly, Taiwan has also increased load and at the same time there have been more than 2.5 m in diameter large-diameter bored piles. "Rocky" With advance with the times, ahead of the pioneers and the sense of rich practical experience, the first to cross over the construction of large diameter piles in the world, has assumed the nine high-speed Jiujiang, Hukou King Bridge, Coriaria Chongqing Yangtze River Bridge , Badong Yangtze River Bridge, Yibin da garden Yangtze River Bridge (Φ2.5 depth of 108 m m), Wuhan Tianxingzhou dual-rail bridge (Φ3.4 depth of 107 m m), 2.5 meters in diameter is greater than even the more than 3.0 m The large-diameter bored piles construction.

Rocky companies with strong technical skills, strict management, well-conceived measures to ensure the project's duration, quality and safety, the company's new business development from the beginning of 1986 new business dynamic, machine vibration, Luoyang has the construction of Yangshan's first power plant, the Sanmen power plant, thermal power plant in the eastern suburbs of Luoyang, Jiaozuo Power Plant, Jiaozuo Thermal Power Plant, water, cooling towers and other infrastructure projects, the use of vibrating pile driver to take Jiaozuo Luoyang expressway, and so on dozens of soft ground treatment National key project, in which the PLA Foreign Languages Institute in Luoyang building teaching Luban Jiang was named the national construction.

We refer friends to cooperate with, confidence, ability and grasp the completion of the project.

Webpage Copyright(c)2008lyjichu.com  ICP Register No.: Henan 07008273 Powered by :www.ce.net.cn