Time forced to Heaven and Earth, Zhengrongsuiyue 30 years.

The rise and fall of wind and rain bumpy road, difficult business Xin Shou more difficult.

10-year rise

In 1974, the fall in October, the city of Luoyang-based engineering (drilling), set up, although there were only a dozen people, a drilling machine, but with vitality in the Party's policy under the guidance of the leadership at all levels Care, in all walks of life with the support of friends from a small, to thrive.

In 1980, Luoyang Qiao construction of the new undertaking from the start, jumped into the dam, railway, bridge deep foundation for the construction of the ranks emerged a large number of outstanding management personnel, to master advanced technology, accumulated rich experience in construction, step Step, a step by step, standing at the top of Mangshan Mountain.

10-year boom

From the beginning of 1985, the company with its own technology, the strength, experience, credibility, one after another takes over the Shouyangshan Thermal Power Plant, Sanmenxia Power Plant, Jiaozhitielu Yellow River Bridge, high-speed Guangshen Zhu Dongbao River Bridge, and so on more than 100 key state Construction of the project has achieved an unprecedented task of a good gain, but also across the Great Wall across the Yangtze River, across the country, with hard sweat hold up the world's Rainbow, with smart and wisdom to write a brilliant chapter in the company.

10-year turbulence

With the development of the times, the original structure is not suitable for market competition. Plus the replacement of leadership many times in serious difficulties and the operation of obsolete equipment, without the confusion of the chapter, the site is not responsible for the account in a timely manner, long-term arrears of wages, resulting in lazy people, low morale and brain drain, particularly from 1997 In the beginning, in cooperation with the outside Association team, "the operating confuse" accelerate the pace of decline in the company's current situation and future, is worried, anxiety, worry, worry. Require restructuring the voice of hope and revitalization of the growing desire.


Black Star, the new sun, the success of the restructuring were encouraging.

Regulation with the progress, Cheng Foundation will have a bright future.

A solid basis for

In 2004, the fall in October, on the basis of Luoyang City Engineering Co., Ltd. unveiled. Before the town of Chaoyang Party committees and governments to comply with the instructions of their superiors, according to the company's request and the status quo, in the most critical moments of crisis, decisively on the basis of the company's restructuring. June 15, Chun-keung, on the basis of Luoyang City Engineering Co., Ltd., with its own strengths and absolute advantage through competitive bidding, according to the law buyout company as a whole to the foundation. By the collective nature of the business changed to private, out of the company, sustained, healthy and rapid development has laid a solid foundation.

Strong measures

After the restructuring short more than 100 days, up and down the people's morale boost, a new look, the morale of success through the smooth transition to the original and Chun-keung, said the company's core essence, the optimized combination of the formation of a new collective leadership and management Institutions, rules and regulations drawn up, absorbed Kuogu equity, a component of real private joint-stock enterprise.

Strict regulation, orderly, timely payment of wages, soon the mobilization of their initiative, enterprise full of unprecedented vigor, the current update, add, nearly 100 organizations, equipment, access to all sites, but also Several large projects are under negotiation, implementation, the company has been completely out of the trough.

Bright prospects

Development is the last word, the company has initially developed a great development goals, determination within three years accumulated over the years to thoroughly clarify the remaining issues, digestion, in a qualification for promotion within three years, directly involved in the project bidding, jumped out on the basis of the professional circles The overall contract bridge construction, expanding the scope of operation, the scale of construction, equipment updated, and gradually raise the level of technology to improve the office environment, modern management in order to meet new challenges, new challenges and scale new heights for the country to make large contributions To allow access to the high interests of the shareholders.